Your shopping cart is empty!
Method Statements, Risk Assessments, Health and Safety Documents Written by a UK Chartered Building Engineer with over 30 years construction experience, Our documents cover Building and Construction, Mechanical & Electrical and other Industries. All Purchases are automatically placed into your account downloads section after Payment has been processed where customers can download instantly after purchase.
This Brick and Blocklaying Pack has been put together with the following Very useful and often asked for Documents:-
Compiled by a UK Chartered Building Engineer with over 30 years Site Experience
Method statement for bricklaying and blockwork
Risk Assessment for bricklaying and blockwork..
£44.99 £17.99
|
Our Painters Pack contains a basic Method statement that is simple to edit and if needed add any site related changes or changes to the safe work method described.
We have included a Work at Height Risk Assessment and a Slips,Trips and Falls Risk Assessment as these are the most common risk facto..
£29.99
|
Our Huge Value Pack...50 plus Documents!........ Ideal for large or small builders and subcontractors, this pack covers all aspects of building work from excavations, foundations, drainage, brick and block work and many more. All documents are written by a Chartered Building Engineer with 30 ye..
£149.99 £49.99
|
By Request we have bundled our popular electrical installation method statement that is written for Part P Building regs and IEE Wiring Regulations (BS7671 Amendment 3 2016) and new risk assessment for general electrical work that covers shock, fire, trips and work at height.
This item also conta..
£17.99 £10.00
|
This 12 document pack of completed examples covers new roadworks with excavations, setting out, kerbs and drainage and gullies.
The documents included are:-
Method Statement for setting out roadworks
Method Statement for excavation and fill of new roadwork
Method Statement for Drainage w..
£59.99 £24.99
|
Our Generic Method Statement & Risk Assessment is suitable for residential dwelling demolition or similar works updated in December 2019.
The Risk Assessment covers in brief:-
Gas and Electric, Fencing and Signage, Working at Height (Falls), Slips and Trips, Road users and Pedestrians, Gen..
£16.99 £9.99
|
This 5 page detailed Method Statement has been compiled with Small Building Works in mind, but just as useful for larger contracts, the works covered are:-
General Safe Work Method
Concrete Foundations
Block and Beam Flooring
Brick and Blockwork
Drainage
Plastering
Pa..
£19.99
|